This is a representative example of what you receive at the end of a 2–4 week Readiness Sprint. Names and figures are illustrative; a real report is built from your own BOM, drawings, and targets under NDA.
The design is fundamentally manufacturable, but the BOM is not yet costed, two mechanical assemblies carry DFM risk, and there is no qualified supplier path for the actuator module. Clearing the three high-priority items below moves the program from "Developing" to "Pilot-ready" in an estimated 6–8 weeks.
The custom joint assembly drives cost, lead time, and reliability risk simultaneously. Resolving its DFM and supplier path unlocks the rest of the schedule.
| Dimension | Score | Finding | |
|---|---|---|---|
| BOM | 2 / 5 | Structured but missing alternates and costs | |
| Drawings | 3 / 5 | Critical drawings released; tolerances incomplete on 4 parts | |
| DFM | 2 / 5 | Not yet reviewed with suppliers; 2 assemblies at risk | |
| Test | 3 / 5 | Bench validation exists; no EOL or reliability plan | |
| Suppliers | 2 / 5 | No qualified source for actuator or harness | |
| Quality | 3 / 5 | Key checks identified; no FAI or CTQ definitions | |
| Cost | 3 / 5 | Target cost set; costed BOM and cost-down roadmap pending |
| Item | Risk | Issue | Recommended action |
|---|---|---|---|
| Joint housing (CNC) | High | Wall thickness and tolerance stack drive scrap and cost | Redesign for machining; 2-supplier RFQ with DFM feedback |
| Actuator module | High | Single-source, no qualified vendor, long lead time | Qualify 2 motor + reducer partners; define acceptance tests |
| Cable harness | Medium | Routing and strain relief undocumented | Harness drawing + connector BOM; test-documented supplier |
| Sheet-metal cover | Medium | Bend radii not manufacturable as drawn | Adjust radii; confirm surface-treatment spec |
| Sensor bracket | Low | Minor tolerance clarification | Release updated drawing |
Figures illustrative; real targets confirmed from live quotes.
Resolve the two high-risk assemblies; complete tolerances and release the drawing pack.
Run category RFQs, qualify the actuator partners, and lock a costed BOM.
First-article checks, DFM issues closed, critical failure modes understood.
Reliability plan, EOL test, quality plan, and a design-freeze candidate.